06 media

A steam room is a wet room; at the survey, the dimensions of the space are examined alongside the water supply, the scope for drainage and the electrical infrastructure. Alcoves next to a bathroom, spa floors and areas beside a pool are the most efficient locations.
Where the generator will be concealed is settled on the first day: it needs a dry space adjoining the cabin, with service access. That decision directly affects the pipe routing and the workmanship.
- Area dimensions and ceiling height
- Water supply line
- Drainage / gully provision
- Electrical infrastructure
- Generator service space
- Target occupancy
- Use case (home / hotel / spa)
- Preliminary budget frame
Why it matters
There are two things in a steam room that cannot be resolved later: a floor without drainage and a generator without access. Both are planned at the survey table, on the very first day.

The signature of steam room design is in the ceiling: so that condensing droplets do not fall on your head, the ceiling is designed domed or sloped, and the droplets run quietly down to the wall. The seating benches, the back support and the foot step are drawn around ergonomics.
Atmosphere layers such as the glass door, the position of the steam nozzle, the aromatherapy unit and the star ceiling are presented in 3D visualisation; the material and colour decisions are taken together.
- Sloped / domed ceiling arrangement
- Bench and backrest ergonomics
- Steam nozzle position
- Glass door orientation
- Aromatherapy unit
- Star ceiling / lighting plan
- 3D visualisation presentation
- Construction drawing approval
A droplet never falls from above
In a steam room with a flat ceiling, the condensation falls on the user as cold droplets — a mistake that ends comfort, and one that is resolved in the design with a slope; afterwards it cannot be resolved at all.

Generator output is calculated from the cabin volume, the cladding material and the proportion of glass. Cold surfaces such as stone and glass condense the steam quickly and are therefore taken into the calculation as additional load.
A correctly sized generator fills the room with dense steam in 20-30 minutes and holds the balance throughout the session; an automatic drain-down and limescale management extend the life of the unit.
- Cabin volume (m³) calculation
- Cladding material coefficient
- Additional load from glass
- kW generator selection
- Automatic drain-down feature
- Limescale management / water hardness
- Electrical supply requirements
- Generator approval and ordering
The generator is the heart of the steam
An undersized generator cannot fill the room; an oversized one consumes needlessly. The calculation is made on the triangle of volume, material and glass — not on guesswork.

The generator's water supply and steam lines, the cabin's electrical and lighting wiring, the floor gully and the waste line are all installed at this stage. The steam pipe is run to a fall so that the condensate cannot flow back.
Because every line will sit behind the finished surface, the workmanship is photographed and added to the handover file — so that years later, when service is needed, what is where is known.
- Water supply line
- Steam pipe laid to a fall
- Floor gully and waste
- Generator electrical supply
- Residual current protection
- Lighting transformer position
- Aromatherapy line (option)
- Photographic record of the infrastructure
A steam pipe without a fall will not do
Condensate collects in a steam line run without a fall, and the nozzle sprays hot water instead of steam. This small-looking detail is comfort itself.

The floor and the walls are waterproofed with a double coat of liquid-applied membrane, together with the corner tapes and the gully detailing. Because a steam room works at 100% humidity, the waterproofing is the real insurance protecting the adjoining spaces.
Once the waterproofing is complete a flood test is carried out; no screed or cladding is started until it is signed off.
- Surface preparation and primer
- Double coat of liquid-applied membrane
- Corner and gully tapes
- Wall-to-floor junction detail
- Moisture protection to the ceiling
- Flood test
- Test record
- Screed and fall preparation
No cladding without a signed-off test
A leak left beneath the finish travels as far as the ceiling of the floor below, and the repair cost multiplies. The flood test is the last gate before the step that cannot be undone.

The cabin shell is built from water-resistant, thermally insulated building panels (XPS-cored). The panels are both light and good at holding the heat of the steam inside — the generator runs less and the room heats up faster.
The bench and step bodies are formed from the same panel; the sloped ceiling form is set up at this stage.
- XPS-cored panel installation
- Sloped ceiling form
- Bench bodies
- Step and footrest
- Nozzle and grille openings
- Panel joint sealing
- Form and level checks
- Framing sign-off
The panel is the steam's ally
A steam room built against an uninsulated wall absorbs the heat and works the generator hard; an insulated panel shell delivers twice the comfort from the same generator.

Glass mosaic, porcelain or natural stone are used for the cladding; on the curved surfaces of a steam room, small-format mosaic gives the cleanest result. The grouting is done with a moisture-resistant epoxy.
The bench seating surfaces are laid to a slight fall so that water cannot pool; surfaces underfoot are given a non-slip texture.
- Mosaic / porcelain selection
- Application to curved surfaces
- Epoxy grouting
- Bench fall detail
- Non-slip floor texture
- Finishes around the nozzle
- Gully level and falls
- Surface inspection and cleaning
The grout cannot be ordinary
Cement-based grout breaks down and darkens over time at 100% humidity; epoxy grout stays as it was on the first day for years. The difference is plain to see by the third year.

The steam room door is toughened glass, threshold-free and sealed; it holds the steam inside while leaving nothing underfoot to trip over. For safety the door opens outwards.
Where a glass front is used, the profiles are specified to resist moisture; the seal line runs unbroken around the opening so that no steam escapes.
- Toughened glass door
- Outward opening
- Unbroken seal line
- Threshold-free transition
- Moisture-resistant profiles
- Hinge and closing adjustment
- Steam leak test
- Installation sign-off
A steam leak is a comfort leak
Steam escaping past an unsealed door upsets the balance of the room and adds moisture to the space outside. Sealing is the mark of quality in a steam room.

During a session a steam room is a sealed box of steam; the real ventilation comes into play afterwards. A timed extract dries the room out and reduces the risk of odour and mould to nothing.
In hotel and spa projects the humidity is balanced by mechanical ventilation so that it does not spill into the adjoining spaces; in domestic projects, practical solutions integrated with the bathroom extract are set up.
- Timed extract fan
- Drying cycle setting
- Humidity balance with adjoining spaces
- Grille positions
- Ductwork routing
- Noise level
- Humidity sensor (option)
- Ventilation testing
A room that dries is a room without odour
A drying cycle of 20-30 minutes after the session is the invisible caretaker that keeps a steam room as fresh as it was on the first day, for years.

The aromatherapy unit meters essences such as eucalyptus and lavender into the steam line. Chromotherapy lighting accompanies the session with colour scenarios, while a fibre-optic star ceiling turns the steam room into a stage for rest.
A touch control panel manages temperature, duration, aroma and light from a single point; in spa projects, remote control from reception can be set up.
- Aromatherapy unit
- Essence dosing adjustment
- Chromotherapy LED scenes
- Fibre-optic star ceiling (option)
- Touch control panel
- Remote management (option)
- Sound system (option)
- Scenario testing
Steam + light + scent = ritual
These three layers are what set a steam room apart from an ordinary wet room; composed correctly, every session becomes a spa ritual.

Steam room cost is shaped by the cabin volume, the generator output, the grade of cladding (mosaic, porcelain or natural stone) and the aroma and lighting options. Whether the infrastructure is already in place also affects the budget.
After the free survey, Çilek Havuz presents every item in writing and with the reasoning behind it; no surprise costs arise as the project progresses.
- Volume and panel item
- Generator output item
- Grade of cladding selection
- Insulation and infrastructure works
- Glass door / front
- Aroma and lighting options
- Delivery and installation
- Item-by-item written quote
The budget is clear from the start
In a steam room the surprise in the cost usually comes out of the infrastructure you cannot see; every detail resolved at the survey makes every item in the quote realistic.

At commissioning the generator cycles, the steam density, the check for dripping from the ceiling and the drying scenario are tested one by one; the first session is run together and a briefing on use is given.
Maintenance is straightforward: periodic descaling of the generator, the post-session drying cycle and cleaning of the surfaces. A properly built steam room works effortlessly for years.
- Generator cycle test
- Steam density measurement
- Ceiling drip check
- Drying scenario test
- Aroma and lighting scenarios
- User briefing
- Descaling maintenance plan
- Warranty and handover record
A steam room is a living space
Periodic descaling and the habit of drying the room out are the two simple rules that protect the life of the generator and the freshness of the room. Çilek Havuz is with you after handover as well.
Our projects
Every project is a transformation story; see the before and after for yourself.


In their own words,their own stories
From corporate facilities to villa projects — short story videos from the names who trusted us.
Wellness Comparison
Each ritual has its own character; together we choose the right warmth.
Finnish Sauna
Dry HeatDry-heat experience · Warm wood textures · A quick ritual
- Temperature
- 80-100°C
- Humidity
- %10-25
- Warm-up
- 30–45 min
- Glass Front / Door
- Aromatherapy
- Chromotherapy
- Göbektaşı Stone
- Scrub & Foam
- Automation
- Starlit Ceiling
- Made to Measure
Steam Room
Dense SteamHigh humidity · Skin-friendly · Compact build
- Temperature
- 40-50°C
- Humidity
- %100
- Warm-up
- 20–30 min
- Glass Front / Door
- Aromatherapy
- Chromotherapy
- Göbektaşı Stone
- Scrub & Foam
- Automation
- Starlit Ceiling
- Made to Measure
Turkish Hammam
TraditionalGöbektaşı ritual · Marble craftsmanship · Scrub & foam
- Temperature
- 40-50°C
- Humidity
- %60-80
- Warm-up
- Always warm
- Glass Front / Door
- Aromatherapy
- Chromotherapy
- Göbektaşı Stone
- Scrub & Foam
- Automation
- Starlit Ceiling
- Made to Measure
Company & Contact
To talk about your project, we are one call away.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Portfolio ·
A selection of pool and spa projects we have brought to life all across Türkiye.
Frequently Asked Questions
Every question on your mind; answered clearly.
Çilek Havuz Technical Team
Pool & Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · E-mail · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
Book a free site surveyA steam room is an enclosed wet space that runs at 40-50°C in a climate close to 100% humidity, on the dense steam produced by a steam generator. The generator feeds steam into the cabin through a concealed nozzle, while the sloped ceiling drains the condensation quietly to the wall. A sauna works on dry heat and a steam room on dense humidity — the two experiences complement each other.
Çilek Havuz Technical Team
In a space where the infrastructure is already in place, a steam room — insulation, panel framing, cladding and commissioning included — is typically completed within a few weeks. The main factors setting the timeline are the state of the drainage and the water supply and how intricate the cladding detail is. The Çilek Havuz technical team sets out a clear schedule at the survey.
Çilek Havuz Technical Team
An area of 2-3 m² is enough for a comfortable two- or three-person steam room; alcoves next to the bathroom and spa floors are the most efficient locations. What is critical is the infrastructure rather than the dimension: a water supply, a floor drain and a dry space with service access for the generator have to be planned.
Çilek Havuz Technical Team
Generator output is calculated from the cabin volume, the cladding material and the proportion of glass — stone and glass condense steam quickly and so add load to the calculation. A correctly sized unit fills the room in 20-30 minutes. Models with an automatic drain-down and limescale management extend the life of the unit considerably; the selection is made together at the survey.
Çilek Havuz Technical Team
Steam condenses on the ceiling and turns into droplets. With a flat ceiling those droplets fall onto the users; with a sloped or domed ceiling they run along the ceiling and down to the wall. That is why a sloped ceiling is the one non-negotiable rule of steam room design.
Çilek Havuz Technical Team
The main cost items are the cabin volume, the generator output, the grade of cladding (glass mosaic, porcelain, natural stone), the glass door and front detail, and options such as aromatherapy and chromotherapy. How far the water, electrical and drainage infrastructure is already prepared also affects the budget. After the free site survey, every item is presented in writing.
Çilek Havuz Technical Team
Not when it is built correctly. A double layer of waterproofing and a vapour-check layer hold the moisture inside the cabin, while a timed extract running after the session dries the room in 20-30 minutes, removing any risk of mould and odour. The steam rooms that cause problems are the ones where the waterproofing and the drying cycle were skipped.
Çilek Havuz Technical Team
It is simple: periodic descaling of the generator, the post-session drying cycle and regular rinsing of the surfaces are all that is needed. Mosaic surfaces with epoxy grout do not stain and keep their first-day appearance for years. On request, Çilek Havuz also provides a periodic maintenance service.
Çilek Havuz Technical Team
Since 1993, Çilek Havuz has been building turnkey steam rooms for villa, apartment, hotel and spa projects all across Türkiye, and brings with it exports to 14 countries and international project experience. A free site survey can be arranged for your province.
Çilek Havuz Technical Team